Satellite view of the US at night showing city lights concentrated in the east and west coasts.Metal electrical substation structure with insulators and wires against a clear blue sky.View looking up at a tall electricity transmission tower with power lines against a clear blue sky.Looking up inside a steel electrical transmission tower against a clear blue sky.Night cityscape with long-exposure light trails from vehicles on a street among illuminated buildings.Electrician in yellow hard hat and gloves working on electrical switch on a wall.Silhouettes of electrical transmission towers and power lines against a clear dusk sky.
American Transmission
S01
About
S02

Powering the New American Industrial Base.

ATLAS is a coalition uniting technologists, industrialists, and policymakers to deploy energy infrastructure faster than ever before with advanced technologies and customer-led development.

Data
S03
2,600,000
MEGAwatts

Energy projects waiting for grid connections nationwide

55
 Miles

New high voltage transmission built in the US in 2023

10
Years

Average timeline for traditional transmission projects

20.8
Billion USD

Annual cost to consumers from grid congestion in 2022, up 64% YoY

100+
YEARS OLD

 For new builds, US utilities are still defaulting to technology patented over a century ago

Issues
S04

America's Prosperity and Security Depends on How We Move Electrons.

We need more grid infrastructure.

The current economic paradigm is driving an unprecedented surge in demand for energy, but it still takes up to a decade to build new transmission lines and supply chains are constraining possibilities. ATLAS is working to create accelerated pathways for new infrastructure investment to ensure that energy customers and citizens are able to get electrons where and when they need them most.

We need better grid infrastructure.

The risk of blackouts and brownouts due to insufficient infrastructure, natural disasters, and adversarial attacks is increasing. ATLAS is working to deploy transmission and other energy infrastructure that combines advanced physical technologies with digital intelligence to create a more robust and resilient grid.

Solutions
S05

Foundations for an Open Approach to Upgrading Grid Infrastructure.

Speed

Privately funded, parallel energy infrastructure development delivers advanced energy infrastructure in months, not years.

Innovation

Markets deliver technology innovation and cost-savings benefits by unleashing private capital and realigning incentives.

Abundance

Today, we are falling victim to artificial perception of grid scarcity. Lowering the barrier to building transmission infrastructure creates more reliable energy for everyone.

Transparency

Corporations are taking advantage of secrecy and regulatory capture. Open access to information creates new opportunities for solutions that benefit everyone.

Security

An enhanced and upgraded grid creates resiliency and protects American industry from natural disasters, adversarial attacks, and other hostile actors.

HYPERLAYER
001

Proving the Future is Possible Today.

A Hyperlayer is a privately funded, next-generation parallel grid - physical proof that America can still build massive infrastructure faster, cheaper, and smarter.

HYPERLAYER
002

Permissionless

We don't wait in decade-long interconnection study queues. We are building independent, high-tech energy zones from scratch.

HYPERLAYER
003

Forcing the Tech Leap

By building a parallel path, we prove what's possible, and create pressure for legacy systems to finally adapt.

HYPERLAYER
004

Zero Ratepayer Risk

100% privately funded. Private capital takes on all the financial and execution risk. Everyday families pay nothing.

Grid Acceleration Corps
S07

Deploying Talent to the Front Lines of the Grid.

The Grid Acceleration Corps deploys recent graduates, engineers, and scientists directly into the field with a two-pronged mandate.

Embed & Audit

Deploy technical teams into utility territories with the highest costs and slowest timelines to uncover bottlenecks, enforce data transparency, deploy AI tools, and clear stagnant interconnection queues.

Enable Energy Sovereignty

Send engineers directly to local municipalities to evaluate alternatives to legacy systems and provide the technical blueprints communities need to build their own independent infrastructure.

Ohio
S06

Heartland Innovation.
Homeland Industrialization.

They call Ohio "America's Industrial Capital" for a reason. We're home to the nation's largest steel foundry. We lead the country in glass, rubber, and plastic production. We're the fourth largest data center hub. We manufacture aircraft, automobiles, life-saving drugs, solar cells, fuel cells, tanks, missiles, robots, and chemicals. We know how to build.

Ohio
S07

A Blueprint for America’s Grid

Ohio was the first in the US to let consumers choose their electricity supplier and this model was quickly adopted across the country. The recent passing of House Bill 15 enables Ohio to leverage our heritage as innovators in energy markets and manufacturing to create a blueprint for building new energy infrastructure in the US faster and more efficiently than ever before.

Join us
S08

Get Updates from
ATLAS